2018 QUARTER 02

A B C D E F G H I K L M N O P R S T U V W
DC-23 - State and regional coordinating bodies
  • Describe how state GIS councils can be used in enterprise GIS&T implementation processes
  • Explain the functions, mission, history, constituencies, and activities of your state GIS Council and related formal and informal bodies
  • Discuss how informal and formal regional bodies (e.g., Metro GIS) can help support GIS&T in an organization
  • Discuss the mission, history, constituencies, and activities of National States Geographic Information Council (NSGIC)
  • Determine if your state has a Geospatial Information Office (GIO) and discuss the mission, history, constituencies, and activities of a GIO
CV-05 - Statistical Mapping (Enumeration, Normalization, Classification, Dasymetric)
  • Discuss advantages and disadvantages of various data classification methods for choropleth mapping, including equal interval, quantiles, mean-standard deviation, natural breaks, and “optimal” methods
  • Demonstrate how different classification schemes produce very different maps from a single set of interval- or ratio-level data
  • Write algorithms to perform equal interval, quantiles, mean-standard deviation, natural breaks, and “optimal” classification for choropleth mapping
DC-13 - Stereoscopy and orthoimagery
  • Explain the relevance of the concept “parallax” in stereoscopic aerial imagery
  • Evaluate the advantages and disadvantages of photogrammetric methods and LiDAR for production of terrain elevation data
  • Specify the technical components of an aerotriangulation system
  • Outline the sequence of tasks involved in generating an orthoimage from a vertical aerial photograph
AM-20 - Stochastic processes
  • List the two basic assumptions of the purely random process
  • Exemplify non-stationarity involving first and second order effects
  • Differentiate between isotropic and anisotropic processes
  • Discuss the theory leading to the assumption of intrinsic stationarity
  • Outline the logic behind the derivation of long run expected outcomes of the independent random process using quadrat counts
  • Exemplify deterministic and spatial stochastic processes
  • Justify the stochastic process approach to spatial statistical analysis
FC-12 - Structured Query Language (SQL) and attribute queries
  • Define basic terms of query processing (e.g., SQL, primary and foreign keys, table join)
  • Create an SQL query to retrieve elements from a GIS
  • Explain the basic logic of SQL syntax
  • Demonstrate the basic syntactic structure of SQL
DC-01 - Survey theory and electro-optical methods
  • Apply coordinate geometry to calculate positions in a coordinate system grid based on control point locations and measured angles and distances
  • Given the elevation of one control point, calculate the elevation of a second point by differential (spirit or direct) leveling
  • Given the elevation of one control point, calculate the elevation of a second point by trigonometric (indirect) leveling
  • Describe the differences between differential and trigonometric leveling
  • Explain how electronic distance measurement instruments work
  • Define the concepts ellipsoidal (or geodetic) height, geoidal height, and orthometric elevation
  • Illustrate the relationship between the concepts of ellipsoidal (or geodetic) height, geoidal height, and orthometric elevation
CV-08 - Symbolization and the Visual Variables

Maps communicate information about the world by using symbols to represent specific ideas or concepts. The relationship between a map symbol and the information that symbol represents must be clear and easily interpreted. The symbol design process requires first an understanding of the underlying nature of the data to be mapped (e.g., its spatial dimensions and level of measurement), then the selection of symbols that suggest those data attributes. Cartographers developed the visual variable system, a graphic vocabulary, to express these relationships on maps. Map readers respond to the visual variable system in predictable ways, enabling mapmakers to design map symbols for most types of information with a high degree of reliability.

PD-07 - System deployment
  • Develop a phasing schedule for deployment of an enterprise-wide system
  • Integrate geospatial applications with other enterprise information systems
KE-21 - System management
  • Demonstrate how the way people do their jobs can affect system management
  • Describe methods for articulating user needs to internal technical support staff
  • Describe how system management includes understanding people
PD-06 - System testing
  • Describe the goals of alpha and beta testing
  • Implement established testing procedures on prototype systems
  • Use testing results to prepare a system for deployment
  • Conduct a quality assurance review

Pages