2018 QUARTER 04

A B C D E F G H I K L M N O P R S T U V W
FC-12 - Structured Query Language (SQL) and attribute queries
  • Define basic terms of query processing (e.g., SQL, primary and foreign keys, table join)
  • Create an SQL query to retrieve elements from a GIS
  • Explain the basic logic of SQL syntax
  • Demonstrate the basic syntactic structure of SQL
CV-08 - Symbolization and the Visual Variables

Maps communicate information about the world by using symbols to represent specific ideas or concepts. The relationship between a map symbol and the information that symbol represents must be clear and easily interpreted. The symbol design process requires first an understanding of the underlying nature of the data to be mapped (e.g., its spatial dimensions and level of measurement), then the selection of symbols that suggest those data attributes. Cartographers developed the visual variable system, a graphic vocabulary, to express these relationships on maps. Map readers respond to the visual variable system in predictable ways, enabling mapmakers to design map symbols for most types of information with a high degree of reliability.

PD-07 - System deployment
  • Develop a phasing schedule for deployment of an enterprise-wide system
  • Integrate geospatial applications with other enterprise information systems
KE-21 - System Modelling for Effective GIS Management

A geographic information system in operation is highly complex, as the scope of the GIS&T Body of Knowledge demonstrates. Modern society relies on many complex systems, but most are self-contained mechanisms with limited and well defined interfaces. A GIS is a complex open system that extends across the realms of hardware, software, data, science, and human processes. A conceptual model of a GIS can be an effective tool to design, implement, operate, maintain, manage, and assessment tool.

PD-06 - System testing
  • Describe the goals of alpha and beta testing
  • Implement established testing procedures on prototype systems
  • Use testing results to prepare a system for deployment
  • Conduct a quality assurance review

Pages